Plot area – 3.37 Acres
100 % fully paid-up land
All bank loan available
Total Tower – 3
Size – 1375, 1600, 1675 Sq.ft
Club Area – 25000
Swimming pool – Half Olympic Size
75 % open Green Area
Construction – In-House by Nirala
Architect Confluence
Floor Tiles – Kajaria
Kohler sanitary fixtures have been used throughout the entire building.
3 Lift are being installed in every tower specifically, high-speed Mitsubishi lift.
Nirala Developer has utilized only treated water alkali-resistant water in all construction activities to ensure the longevity of the building and prevent concrete degradation.
Nirala Developer has utilized Asian Paints' high-performance, elastomer- and acrylic-based exterior emulsions to protect the building's paintwork, ensuring that the exterior surfaces do not peel or flake when exposed to sunlight and rain. This coating possesses the capacity to withstand sunlight, heat, and rain for a minimum of 10 years.
At Nirala Trio, you will find a wardrobe and an inverter AC installed in every room.
Only steel-framed tempered glass has been installed in all the balconies of the building.
High-performance glass has been installed in every window of the building to ensure that, amidst this scorching heat, the external heat does not penetrate the interior.
Believe me, the pricing for this project specifically for the 3 BHK units is currently very attractive during the pre-launch phase. Its location and connectivity are also exceptionally appealing. Most importantly, your apartment will be ready for handover in just 10 months.
Currently, you are required to make a payment of only 20%; the remaining 80% is payable upon receiving possession.